Skip to content


COLORADO RIVER ELEVATED BIKEWAY CONSTRUCTION UPDATE…April 2013

elevatedbikeway-before&after

Work continues on the $10 million Colorado River Elevated Bikeway. NOTE: That’s the same cottonwood in all four photos, the “Leaning Tree.” The ‘before’ top image was taken from the upstream side.

(updated photo courtesy of MOAB SUN NEWS)

For the most recent information on construction,  please follow this link to a story by the MOAB SUN NEWS: 

http://www.moabsunnews.com/news/article_98a7a6bc-ac3f-11e2-a646-0019bb30f31a.html

elevatedbikeway-before&after2

Posted in Uncategorized.

0 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

Some HTML is OK

(required)

(required, but never shared)

or, reply to this post via trackback.