Work continues on the $10 million Colorado River Elevated Bikeway. NOTE: That’s the same cottonwood in all four photos, the “Leaning Tree.” The ‘before’ top image was taken from the upstream side.
(updated photo courtesy of MOAB SUN NEWS)
For the most recent information on construction, please follow this link to a story by the MOAB SUN NEWS:
http://www.moabsunnews.com/news/article_98a7a6bc-ac3f-11e2-a646-0019bb30f31a.html
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.